A Step-by-Step Guide to Elevator Installation Process

🧱 A Step-by-Step Guide to Elevator Installation Process

Installing an elevator is not just a technical job — it’s a careful process that involves planning, construction, and precision engineering. Whether it’s for a home, office, or commercial project, here’s how the elevator installation process typically works, step by step.


🏗️ 1. Site Survey & Planning

Every installation starts with a site survey by professionals. This includes:

  • Measuring shaft space

  • Verifying power supply

  • Understanding building structure

  • Choosing the right lift type and size

📌 At this stage, customization options like door type, cabin design, and weight capacity are also discussed.


📐 2. Shaft Construction (If Not Existing)

If your building doesn’t have a ready-made shaft:

  • A vertical hoistway is constructed using RCC or steel frame structure

  • A pit is made at the bottom (usually 200mm to 1500mm deep)

  • Overhead clearance is created at the top of the shaft

This phase must align with architectural drawings and safety codes.


⚙️ 3. Mechanical Setup

Once the shaft is ready:

  • Guide rails, brackets, and base frame are installed

  • The elevator machine (motor) is mounted — either above the shaft (traction) or at the bottom (hydraulic)

  • Counterweight setup is added (for traction lifts)

All structural components must be tightly aligned for safety and smooth movement.


🔌 4. Electrical Wiring & Control Panel

A dedicated power line is installed for the elevator:

  • Wiring is done from the control cabinet to the motor, switches, and sensors

  • Emergency systems (UPS, ARD) are integrated

  • Testing of the power system and backup begins


🚪 5. Cabin & Door Installation

Next, the visible parts come in:

  • Cabin structure is fixed inside the shaft

  • Doors (manual or auto) are installed on all landings

  • Safety locks, sensors, and door closers are tested

Cabins are also fitted with lights, fans, and display panels.


🧪 6. Testing & Commissioning

Before opening for public or home use, a full test run is done:

  • Speed, braking, emergency stop, and leveling are checked

  • Safety systems are verified

  • Certification and approval may be required depending on local laws


🧾 7. Handover & Training

Finally:

  • The elevator is handed over to the client

  • A brief is given on how to operate, what to do in emergency, and how to maintain

  • Maintenance contract or support plan is usually offered


Conclusion

Elevator installation is a structured process that requires technical skills, precision, and the right equipment. Choosing a trusted provider like Pak Elevator ensures your lift is not only installed properly but also backed with reliable support, safety compliance, and future upgrades.